We specialize in providing comprehensive fabrication, manufacturing, and installation services for prefabricated steel buildings. Our solutions are designed to meet the diverse needs of industrial, commercial, and residential projects.
With advanced technology, skilled professionals, and years of experience, we ensure high-quality structures that are cost-effective, durable, and environmentally friendly. Our services include:
- Steel structure fabrication: Precision cutting, welding, and assembly.
- Prefabricated component manufacturing: Tailored to client specifications.
- On-site installation and assembly: Fast and efficient construction.
Whether you’re looking for warehouses, factories, showrooms, or residential buildings, we are committed to delivering turnkey solutions that exceed your expectations.
The construction of prefabricated steel buildings follows three main phases: Design – Manufacturing – Erection.
1. Design
The design phase plays a crucial role in the success of the prefabricated steel building project. The drawings must ensure absolute accuracy in terms of dimensions, number of components, and technical specifications to avoid errors that may affect the quality of the construction.
- Site survey and planning: Survey the location, site layout, and propose optimized design solutions to the investor.
- Preparation of design documents: This includes architectural drawings, manufacturing drawings, and cost estimation plans.
2. Fabrication of Steel Components
The fabrication process is carried out in the factory using modern machinery and undergoes strict quality and quantity inspections. The steps include:
- Receiving raw materials and supplies
- Cutting steel
- Shaping and forming components
- Tacking welds to assemble components
- Straightening and adjusting components
- Completing welding
- Surface cleaning and shot blasting
- Painting
- Final inspection and warehousing.
3. Erection Process for Prefabricated Steel Frame Buildings
During the construction phase, close coordination between departments ensures that the project timeline is met. Construction progress supervisors regularly update and report on the project status and implement contingency plans as needed.
Safety measures are prioritized with rigorous monitoring throughout the construction process to ensure safe operations.
Key steps of the erection process include:
- Receiving and storing construction materials
- Installing foundation anchor bolts
- Erecting the main steel frame
- Installing roof panels
- Installing wall cladding
- Final finishing and project handover
This structured and detailed process ensures that prefabricated steel buildings are completed with high precision, quality, and adherence to the agreed schedule.